Confirm Scope & Fee
Ensure the order qualifies for kitting (multi-pack or client-supplied items).
Confirm the customer has accepted the kitting fee and volume threshold has been met.
Specify Freight Method
Set freight method to: SEE NOTE in IQ or job system.
Clarify any dispatch instructions in job notes (e.g. multi-piece consignment, fragile, etc.).
Define Box Specifications
The Account Manager must specify the box dimensions clearly for Prepress.
Format: Please make X boxes measuring [L]mm x [W]mm x [H]mm.
No other kitting content details need to be passed to Prepress.
Create Kitting Sheet
Complete the kitting sheet using the standard template (see Spark DS example). J119880
Include:
Total number of kits
Exact list of items in each kit
Any sequence or layout required
Save it in the Supporting Docs folder for the order.
Label and Stage Extra Items
For customer-supplied or internal extras:
Label clearly as: ITEMS FOR KITTING – [Client/Job Name]
Indicate exact location (e.g., “In office, 2 boxes in front of cabinet”).
Ensure quantity aligns with order volume + extras (buffer if required).
Notify Operations Manager
Before the job enters production, flag it with the Operations Manager.
This must occur before standard lead time kicks in, to allow:
Planning in upcoming team meetings
Coordination of packing staff or space
No fallback – must be actioned.
Final Prep Before Production
Once approved, input the job into the system as normal.
Job notes must include:
Reference to kitting
How the items are sent
Any dispatch or tracking expectations